Saturday, 12 October 2019

Induction video evaluation





Production process
In the process of filming we did have multiple problems in our project. This started with the fact that we were filming in a corridor that had a lot of windows, and we had to film on two separate days where one day was dark and rainy and the other was sunny so that created some continuity errors. We also didn't shoot as many shots as we needed so there wasn't a lot to add to the film. Also while filming the whole of the group would never be present to help with the filming process.

Editing
Another problem was faced while editing because while the footage was being transferred from the SD card to the computer a few of the main shots were somehow lost, creating a problem. This meant we had to go back out to record another shot so the film still stuck to the brief of passing a package. The editing process i think still went well as we tried to make it look as good as we could with the shots we had despite some were missing which would have made it make more sense. 

Continuity
There was a few continuity errors such as the weather as we filmed on the two separate days so in some shots it was sunny and others it was dark and rainy, so we tried to hide that error by turning all the shots into black and white so it would be a lot less noticeable. Another continuity error which was due to the separate days of filming was our actor was wearing different clothes in the shots he is in, which is then another reason we turned it into black and white.

Summary 
My overall summary of this task is that it definitely could have gone a lot better than what it did as it didn't turn out to how i expected it to be. I also think our group could have worked better as a team to get things done and figure stuff out as then maybe it would have turned out better. But i think with all the problems that we had, we did as well as we did to try and fix it.

No comments:

Post a Comment